Deterministic Compliance for the ERCOT Grid

SB 6 Regulatory Audits (Texas Large Load)

We provide the mandatory Load Commissioning Plans and technical documentation required by the Public Utility Commission of Texas (PUCT).

  • Study-Ready Intelligence: We help you navigate the $100k+ transmission screening studies by providing pre-verified telemetry.

  • Emergency Curtailment Protocols: We design the "coordinated response" protocols that ERCOT now requires for data centers to keep their "right to operate" during grid stress events.

Digital Asset Passports (Asset Integrity)

Move beyond paper records. Our Passports are the Forensic Receipt for your $100M+ hardware investment.

  • Verification: Immutable documentation of thermal-power lifecycle to support warranty claims with silicon manufacturers.

  • Underwriting Support: Provide insurers (like FM Global) with SHA-256 hashed evidence of safe operation, potentially lowering your premiums in the high-risk Texas market.

Capacity & Harmonic Mapping

Reclaim "Lost" MWs. Texas transmission is expensive; don't waste 20% of it on electrical noise.

  • Power Reclamation: Our v012-OBSIDIAN engine identifies micro-transient harmonics, allowing you to increase your compute density without exceeding your ERCOT-allotted power cap.

  • Grid Transparency: Verifiable proof that your facility is not "polluting" the local grid, preventing expensive utility penalties.